
The master class of September 2010 in Dar Es Salaam resulted in three turbines in total. The 1.8 meter model (peak power 350W) was still lying in the store waiting to be installed. Last week, there was finally an opportunity to install it. Tatedo has chosen for powering a public service house in Kwemasimba, a… Read more »